母線槽的撓度應(yīng)不大于跨度的多少
The installation of the bus groove can be directly received from the transformer to the low-voltage distribution cabinet, and also can be directly connected to the distribution system from the low-voltage cabinet as the main line of the distribution.
1、電纜橋架與一般工藝管道(如壓縮空氣管道等)平行架設(shè)時不小于400mm,與具有腐蝕性液體管道平行架設(shè)時不小于500mm,與熱力管道平行架設(shè),熱力管道有保溫層時不小于500mm,無保溫層時不小于1000mm。
1, cable tray and general piping (such as compressed air pipe etc.) parallel erection shall not be less than 400mm, and the corrosive liquid pipeline parallel erection shall not be less than 500mm, set up in parallel with the heat pipe, heat pipe with insulation layer is not less than 500mm, no insulation layer is not less than 1000mm.
2、電纜橋架的總平面布置應(yīng)作到距離短,經(jīng)濟(jì)合理,運(yùn)行,并應(yīng)滿足施工安裝,維修和敷設(shè)電纜的要求。
2, the overall layout of the cable bridge should be the shortest distance, economic, reasonable and safe operation, and should meet the requirements of construction, installation, maintenance and installation of cables.
3、電纜橋架從正常環(huán)境穿墻進(jìn)入防火、防爆的環(huán)境時,墻上應(yīng)安裝相應(yīng)的密封裝置,從室內(nèi)穿墻室外時,在墻的外側(cè)應(yīng)采取防雨措施。

3, the cable bridge from the normal environment through the fire, explosion-proof environment, the wall should be installed in the corresponding sealing device, from the interior through the wall to the outside, in the outer wall should be taken rainproof measures.
4、電纜敷設(shè)后,電纜橋架的撓度應(yīng)不大于電纜橋架跨度的1/200。當(dāng)電纜橋架的跨度≥6000mm時,其撓度應(yīng)不大于電纜橋架的跨度的1/150。
4. After cable laying, the deflection of the cable tray shall be no more than 1/200 of the span of the cable bridge. When the cable bridge span is greater than or equal to 6000mm, the deflection should be less than 1/150 of the span of cable bridge.
5、電纜橋架與一般工藝管道交叉時,不小于300mm,與具有腐蝕性液體管道下方或具有腐蝕性氣體管道上方交叉時,應(yīng)不小于500mm,與熱力管道交叉,熱力管道有保溫層時,應(yīng)不小于500mm,無保溫層時,應(yīng)不小于1000mm。
5, cable bridge and the general process of pipeline crossing, not less than 300mm, the corrosive gas pipeline above and below the cross pipe or corrosive liquids, shall not be less than 500mm, and the cross heat pipe and heat pipe with insulation layer, should be not less than 500mm, without thermal insulation, should not be less than 1000mm.
帶插口的母線槽,可通過插接頭箱或插接開關(guān)箱,能很方便地引出電源分路。母線槽具有體積小、結(jié)構(gòu)緊湊、傳輸電流大、維護(hù)方便等優(yōu)點(diǎn)。
The bus duct with a socket can conveniently draw out the power supply through the socket head box or the plug-in switch box. The utility model has the advantages of small volume, compact structure, large transmission current, convenient maintenance, etc..
本文的精彩內(nèi)容來自山東電纜橋架詳細(xì)內(nèi)容請點(diǎn)擊我們的網(wǎng)站: http://www.qianhe02.com/謝謝您的到來!
The exciting content of this article comes from the Shandong cable bridge price. Please click on our official website: http://www.qianhe02.com/, thank you for coming!
下一篇:復(fù)合型防腐屏蔽電纜橋架的應(yīng)用
相關(guān)文章 / Recommended news
- 山東電纜橋架屋頂?shù)跹b:配件清單+標(biāo)準(zhǔn)化流程,新手也能零失誤
- 濟(jì)南電纜橋架安裝:200多斤600×200橋架,這樣吊裝又
- 山東電纜橋架定制:耐火板與防火型的核心區(qū)別,一文讀懂避坑指南
- 濟(jì)南電纜橋架選型誤區(qū):100×100規(guī)格加隔板難?航豐的方案破解施工難題
- 山東電纜橋架避坑!貫穿孔成火災(zāi)“隱形通道”?3步防火實(shí)操筑牢防線
- 濟(jì)南電纜橋架鋪設(shè)踩坑,層數(shù)、根數(shù)、限制,規(guī)范不看必返工
- 山東電纜橋架(鍍鋅款)接地線誤區(qū),接錯必返工,規(guī)范要點(diǎn)一文說清
- 濟(jì)南電纜橋架線纜捆扎錯了=埋隱患,4種規(guī)范方法,施工必看
- 山東不銹鋼橋架現(xiàn)場打孔避坑!4步標(biāo)準(zhǔn)流程,90%施工方少走彎路不損橋架
- 山東電纜橋架選型封神指南!記住3句話,70%工程方避開選型陷阱不花冤枉錢
陽極氧化鋁合金橋架
托盤式電纜橋架
梯式電纜橋架
梯式不銹鋼電纜橋架
深灰色金屬防火電纜橋架